A verification is only as useful as the record it leaves behind. This briefing outlines what a field verification of a critical control could capture so that leaders can read the results over time.
A control that is present can still fail
A control can be present and not in working condition, or in working condition and not used as designed. A verification that separates the three gives a leader more to act on than a single pass or fail.
Exhibit 1 Illustrative data
In this illustrative site, energy isolation carries the most overdue control verifications
Overdue critical-control verifications by control, one site, one quarter, count
SourceIllustrative data for design purposes only. Not a research finding and not to be quoted.
NoteValues are placeholders chosen to demonstrate the exhibit format. They describe no real site.
Data behind this exhibit
| Item | Value |
|---|---|
| Energy isolation | 14 |
| Work at height | 9 |
| Confined space entry | 6 |
| Lifting operations | 5 |
| Line breaking | 3 |
Cite this exhibit
Before the Incident, “In this illustrative site, energy isolation carries the most overdue control verifications,” Exhibit 1 (2026). Illustrative data; not a research finding and not to be quoted. Link
Overdue verifications
Overdue verifications are a condition of the system, not a judgment of the people who own them. The exhibits use illustrative values only; they demonstrate the format, not a result.
Exhibit 2 Illustrative data
In this illustrative site, only energy isolation shows a steady fall in completed verifications
Planned critical-control verifications completed, four controls, one site, by quarter of 2025, percent
SourceIllustrative data for design purposes only. Not a research finding and not to be quoted.
NoteValues are placeholders chosen to demonstrate the small-multiples format. All panels share one axis.
Data behind this exhibit
| Item | Value |
|---|---|
| Energy isolation: Q1 | 88% |
| Energy isolation: Q2 | 80% |
| Energy isolation: Q3 | 71% |
| Energy isolation: Q4 | 62% |
| Work at height: Q1 | 90% |
| Work at height: Q2 | 89% |
| Work at height: Q3 | 91% |
| Work at height: Q4 | 90% |
| Confined space entry: Q1 | 85% |
| Confined space entry: Q2 | 86% |
| Confined space entry: Q3 | 84% |
| Confined space entry: Q4 | 87% |
| Lifting operations: Q1 | 92% |
| Lifting operations: Q2 | 90% |
| Lifting operations: Q3 | 93% |
| Lifting operations: Q4 | 91% |
Cite this exhibit
Before the Incident, “In this illustrative site, only energy isolation shows a steady fall in completed verifications,” Exhibit 2 (2026). Illustrative data; not a research finding and not to be quoted. Link
A backlog concentrated in one control is a different problem from a backlog spread across all of them.
The current report
The controls that prevent a fatality
Many operations have spent a decade driving recordable injury rates down. This report asks whether the controls that prevent a fatality have improved at the same pace, and how a leadership team would know.